Traffic Studies

Project Access & Egress Design

We design project entrances and exits for minimum interference with the road, with acceleration lanes, safe exit lanes and compliant spacing.

  • Professional Engineering Team
  • Fast Service
  • High Quality
  • Trusted Engineering Solutions
Project Access & Egress Design
Overview

What is this service?

Careful planning and design of a project's entrances and exits so they interfere as little as possible with the prevailing traffic on the adjoining road. ABAK's team identifies the best access and egress positions with due regard to spacing and safe distances from intersections and major junctions, and designs safe exit lanes and additional acceleration lanes where needed to absorb the movement smoothly and safely.

Why do you need this service?

Safe, smooth entry and exit with minimal impact on the road.

Avoids bottlenecks at the project's access points.

Compliance with the regulatory spacing from intersections.

A condition for approval of the traffic study and the project.

How It Works

Service Preparation Steps

01

Site study

We study the site, the adjoining road and its traffic movement.

02

Positioning

The optimal access and egress positions are identified.

03

Spacing

Safe distances from intersections are observed.

04

Design

Exit lanes and acceleration lanes are designed.

05

Deliverables

The illustrative drawings are produced.

What does the service include?

Identification of the optimal access and egress positions.
Design of safe exit lanes and acceleration lanes.
Observance of spacing from intersections and junctions.
Illustrative drawings of the access and egress arrangements.
Quality & Compliance

Approved Standards & Codes

Traffic engineering manual (Ministry of Transport)
Municipality requirements for access and egress
AASHTO access design standards

Frequently Asked Questions About This Service

How much does the access position matter?

The entrance position determines how smoothly vehicles enter and leave and how much that disturbs the road. An entrance too close to an intersection, or set at the wrong angle, creates daily congestion — a recurring reason for comments on a traffic study.

When is an acceleration or deceleration lane required?

Where the road is fast-moving or the volume entering and leaving is high; the lane separates project traffic from through traffic, reducing friction and collision risk.

Can an existing project's accesses be modified?

Yes — the existing situation is studied and changes proposed to positions, dimensions and internal circulation, then submitted to the competent authority for approval before implementation.

Why Choose abak?

We combine deep engineering expertise with high quality standards to deliver solutions you can trust.

Experienced Engineers

A team of certified consultants and engineers with long experience in the Saudi market.

High Quality Standards

Strict adherence to the Saudi Building Code and international engineering best practices.

Modern Engineering Solutions

We use the latest tools and technologies to deliver precise, efficient designs.

Professional Consultation

We listen to your needs and design the right solution for your project and budget.

Fast, Reliable Delivery

We commit to timelines and deliver our projects on schedule.

How It Works

How We Work With You

Clear steps from first contact to final delivery.

  1. 1

    Contact Us

    Reach us on WhatsApp or by phone and share your project details.

  2. 2

    Requirement Analysis

    We study your needs and set a clear, suitable engineering plan.

  3. 3

    Engineering Execution

    Our team executes the work precisely to the highest standards.

  4. 4

    Final Delivery

    We hand over complete deliverables with post-delivery support.

Ready to Start Your Project?

Reach our team now on WhatsApp and get a consultation tailored to your service.