Looking for a trusted environmental consulting firm? Explore the services of Abak Green, part of Abak Engineering Consulting, from environmental permit issuance and renewal to studies, reports, monitoring, waste management, and sustainability.
A building permit is the official approval issued by the municipality through the Balady platform before any construction starts. This guide covers eligibility, required documents, step-by-step issuance, the engineering office's role, latent defects insurance, validity, renewal, and common reasons for delays and rejection.
A Civil Defense license (Salamah license) is required to operate most commercial and industrial facilities in Saudi Arabia. This guide explains the difference between the license, the safety permit and the safety certificate, who needs it by risk level, required documents, the Salamah steps, and when approved safety plans are needed.
What does an interior design office provide? The stages from concept to construction drawings, the deliverables you receive, when you need a restoration or modification permit, and how to choose an interior design office.
What is a restoration permit and when do you need it? The requirements for a building restoration permit on Balady, the steps, the official fees per square metre, processing time, and how it differs from a modification.
What does an engineering office do to obtain a building permit on Balady? The difference between design and supervising offices, how to verify accreditation, and what your contract should include.
How much does it cost to modify a building permit? An explanation of Balady's Add and modify building components service, the real cost items, and cases such as reducing from two floors to one or adding an annex.
What is engineering supervision and why is it required for a building permit? The supervising office's duties during construction, its link to construction notifications and the occupancy certificate, and what the supervision contract should include.
A guide to building permit issuance on Balady: the types of construction licences and when you need each, issuance stages from authorisation to printing, and permit validity, extension and renewal.
How to obtain a building permit in Saudi Arabia from the owner's perspective: the deed and survey decision, authorising the office, hidden defects insurance and payment, with a checklist and reasons for delays.
Building completion certificate requirements and the steps to obtain it on Balady for new and old permits: the six-month rule, hidden defects insurance, the supervising office's role, and a pre-application checklist.
What is the building completion certificate? How it differs from the occupancy and compliance certificates, its official fees of SAR 200 to 400, and its link to hidden defects insurance.