Demolition Permit
We obtain a demolition permit for safe, lawful demolition — including the impact study on neighbouring properties, the safety requirements and follow-up to issuance.
- Professional Engineering Team
- Fast Service
- High Quality
- Trusted Engineering Solutions

What is this service?
An official authorisation to demolish an existing building safely and lawfully in line with the applicable safety requirements. It covers the study of the demolition's impact on neighbouring utilities and buildings, preparation of the required documents and their submission to the authority through Balady. ABAK inspects the site, sets out the safety requirements, files the application and follows it through to issuance.
Why do you need this service?
Carries out demolition lawfully and safely under formal authorisation.
Protects neighbouring buildings and utilities during the works.
A prerequisite before rebuilding on the plot.
Avoids legal liability for any resulting damage.
Service Preparation Steps
Inspection
We inspect the building to be demolished and the surrounding properties.
Authorisation
ABAK is appointed as the engineering office on the Balady platform.
Documents
Demolition documents and safety requirements are prepared.
Submission
The application is filed on Balady.
Follow-up
We track and resolve review comments through to approval.
Issuance
The demolition permit is collected.
What does the service include?
Approved Standards & Codes
Frequently Asked Questions About This Service
Can a building be demolished without a permit?
No. Demolishing without authorisation is a violation that leaves the owner liable for any damage to neighbouring properties or utilities. The permit is issued through Balady after inspecting the building and its surroundings and setting out the safety requirements.
What safety requirements apply during demolition?
They cover securing the site perimeter and protecting neighbouring buildings and utilities, selecting a demolition method suited to the structure, and complying with municipality and Civil Defense requirements on waste removal, dust suppression and noise.
What documents are required for a demolition permit?
The title deed and details of the building to be demolished, the inspection report and demolition documents prepared by the engineering office, and authorisation of that office to file the application and clear review comments through to approval.
Do I need a demolition permit before rebuilding?
Yes — lawfully removing the existing structure is a prerequisite before starting a new build on the plot, and it is the basis on which the new building permit is later issued with drawings compliant with the Saudi Building Code.
Why Choose abak?
We combine deep engineering expertise with high quality standards to deliver solutions you can trust.
Experienced Engineers
A team of certified consultants and engineers with long experience in the Saudi market.
High Quality Standards
Strict adherence to the Saudi Building Code and international engineering best practices.
Modern Engineering Solutions
We use the latest tools and technologies to deliver precise, efficient designs.
Professional Consultation
We listen to your needs and design the right solution for your project and budget.
Fast, Reliable Delivery
We commit to timelines and deliver our projects on schedule.
How We Work With You
Clear steps from first contact to final delivery.
- 1
Contact Us
Reach us on WhatsApp or by phone and share your project details.
- 2
Requirement Analysis
We study your needs and set a clear, suitable engineering plan.
- 3
Engineering Execution
Our team executes the work precisely to the highest standards.
- 4
Final Delivery
We hand over complete deliverables with post-delivery support.
Related Services
Discover other services that may interest you
Ready to Start Your Project?
Reach our team now on WhatsApp and get a consultation tailored to your service.




