Industrial Licence Amendments
We amend industrial licences — change of activity, expansion, change of components — on the MODON platform, updating the drawings and following through to approval.
- Professional Engineering Team
- Fast Service
- High Quality
- Trusted Engineering Solutions

What is this service?
Why do you need this service?
Updates the licence so it lawfully reflects the expansion or change of activity.
Avoids violations for operating outside the scope of the existing licence.
Aligns the amendment with Modon's requirements and its environmental impact.
Keeps operations running while the amendment is processed.
Service Preparation Steps
Defining the change
The type of amendment is defined — activity, expansion or components.
Updating drawings
Drawings and documents are updated to reflect the amendment.
Compliance
The amendment is checked against Modon's requirements and environmental impact.
Submission
The amendment application is filed on the Modon platform.
Follow-up
We track review comments through to approval.
Approval
The amended industrial licence is approved.
What does the service include?
Approved Standards & Codes
Frequently Asked Questions About This Service
When do I need to amend an industrial licence?
When changing the industrial activity, expanding the factory, or altering the area, components or production lines — any change that makes reality differ from what the existing licence records.
Do operations stop during the amendment?
Managing the file properly is precisely what keeps operations running while the amendment is processed, unless the change itself requires a technical shutdown for the construction work.
Does an amendment affect the environmental clearance?
Yes — changing the activity or expanding may change the environmental impact classification, so the environmental clearance is reviewed as part of the amendment before the revised licence is approved.
Why Choose abak?
We combine deep engineering expertise with high quality standards to deliver solutions you can trust.
Experienced Engineers
A team of certified consultants and engineers with long experience in the Saudi market.
High Quality Standards
Strict adherence to the Saudi Building Code and international engineering best practices.
Modern Engineering Solutions
We use the latest tools and technologies to deliver precise, efficient designs.
Professional Consultation
We listen to your needs and design the right solution for your project and budget.
Fast, Reliable Delivery
We commit to timelines and deliver our projects on schedule.
How We Work With You
Clear steps from first contact to final delivery.
- 1
Contact Us
Reach us on WhatsApp or by phone and share your project details.
- 2
Requirement Analysis
We study your needs and set a clear, suitable engineering plan.
- 3
Engineering Execution
Our team executes the work precisely to the highest standards.
- 4
Final Delivery
We hand over complete deliverables with post-delivery support.
Ready to Start Your Project?
Reach our team now on WhatsApp and get a consultation tailored to your service.
Related Articles
- Safety & Civil Defense
Changing a Shop's Activity: What Changes in Safety Requirements?
A clothing shop becoming a restaurant, an office becoming a salon, a warehouse changing the type of goods it stores: all of these are changes of activity that look administrative, but they fundamentally change the safety requirements.
Read article - Licenses & Certificates
Building Requirements in Industrial Cities: Setbacks and Parking
Industrial land is not open space to build on as you please. MODON publishes building standards and requirements guides for industrial cities, the reference against which drawings are reviewed before approval. MODON describes the guide as a resource for knowing all building requirements in its industrial cities.
Read article - Licenses & Certificates
Modifying Building Components (Shops, Facades, Merging Units): What Needs a Permit and What Does Not
Want to open a shop in your building's facade, merge two apartments or change the facade? The first question is whether this is a modification of components or a restoration, because each has a different service on Balady.
Read article 
Made Changes Without Updating the Drawings? Risks at Occupancy and Sale
"Let's make the room a bit bigger", "open a door here", "build the annex larger": decisions often taken on site without amending the drawings. The result is a building that differs from its permit, and a problem that surfaces later.
Read article