Pre-Submission Engineering File Review
We review the completeness and accuracy of the engineering file for an off-plan project before submission, catching gaps and avoiding rejection.
- Professional Engineering Team
- Fast Service
- High Quality
- Trusted Engineering Solutions

What is this service?
Why do you need this service?
Catching gaps before submission avoids rejection by the committee.
Improves the odds of first-time acceptance and saves time.
Confirms the accuracy of the drawings, progress percentages and programme.
Avoids comment cycles that push back the start of sales.
Service Preparation Steps
Receiving the file
We receive the project's engineering file.
Drawing review
The drawings are reviewed against the requirements.
Programme review
The construction programme and progress-percentage study are reviewed.
Gap analysis
Gaps and likely comments are identified.
Report
The review report and recommendations are issued.
Readiness
The file is confirmed ready for submission.
What does the service include?
Approved Standards & Codes
Frequently Asked Questions About This Service
What is the difference between preparing and reviewing the file?
Preparation builds the file from scratch; review applies to a file already assembled by the developer or another office — we check it for completeness and accuracy and identify the gaps before submission, avoiding a rejection cycle.
Which findings recur most often?
A programme that is unrealistic against the scope of works, progress percentages that do not map onto the project's actual line items, and drawings that are incomplete or inconsistent with each other.
Does the review confirm the file is ready?
Yes — it is delivered as a review report with clear recommendations, and once the findings are cleared the file is confirmed ready for submission on the Wafi platform.
Why Choose abak?
We combine deep engineering expertise with high quality standards to deliver solutions you can trust.
Experienced Engineers
A team of certified consultants and engineers with long experience in the Saudi market.
High Quality Standards
Strict adherence to the Saudi Building Code and international engineering best practices.
Modern Engineering Solutions
We use the latest tools and technologies to deliver precise, efficient designs.
Professional Consultation
We listen to your needs and design the right solution for your project and budget.
Fast, Reliable Delivery
We commit to timelines and deliver our projects on schedule.
How We Work With You
Clear steps from first contact to final delivery.
- 1
Contact Us
Reach us on WhatsApp or by phone and share your project details.
- 2
Requirement Analysis
We study your needs and set a clear, suitable engineering plan.
- 3
Engineering Execution
Our team executes the work precisely to the highest standards.
- 4
Final Delivery
We hand over complete deliverables with post-delivery support.
Ready to Start Your Project?
Reach our team now on WhatsApp and get a consultation tailored to your service.
Related Articles

How Long Does Wafi Licensing Take and Causes of Delay
"When can I start selling?" is every developer's question. The answer passes through several stages, some with statutory timeframes set in the Implementing Regulations, and some that depend on how ready your file is.
Read article
Wafi Platform: The Complete Guide for Real Estate Developers
Off-plan sales let a developer fund part of a project from buyers' payments, but the activity is tightly regulated to protect those funds. It is governed by the Law on Off-Plan Sale and Lease of Real Estate Projects and its Implementing Regulations, and supervised by the Real Estate General Authority (REGA) through the Wafi programme.
Read article
Off-Plan Sales in Saudi Arabia: Market Development and Future Outlook
Off-plan sales have emerged as one of the most prominent modern methods in the Saudi real estate market. They are viewed as an effective tool for achieving real estate development goals, providing diverse housing options, and accelerating the pace of homeownership for citizens. With the major transformation taking place in the real estate sector, off-plan sales have become an integral p…
Read article
Progress Reports in Wafi: Who Prepares Them?
In off-plan sale projects, the progress report is not an internal report for the developer; it is a document REGA requests and makes public, and disbursement decisions are based on it.
Read article