Short answer: Building "fasah" is the common Saudi term for a building permit: the official municipal permission to build on your plot according to approved drawings. The word dates from the paper-based municipality procedures, and today the permit is issued online through the Balady platform via an accredited engineering office.
Key Points
- "Fasah", "building permit" and "building permission" refer to essentially the same document.
- Without it, construction is a violation and risks a stop order and fines.
- It defines what may be built: use, areas, floors and setbacks.
- It is issued on Balady, with fees per square metre by building type and municipality category.
Why Is It Called "Fasah"?
In Arabic, fasah means permission or clearance, and in municipal procedures it meant the municipality had "cleared" the owner to build after reviewing the drawings. People still say "the fasah came out" meaning the building permit was issued, while official platforms use the term "building permit".
Types of Fasah (Construction Permits)
| Type | When you need it |
|---|---|
| New building | To build on a vacant plot |
| Restoration | To repair an existing building without substantial change. See restoration permit |
| Demolition | To remove an existing building. See demolition permit |
| Fencing | To fence a vacant plot. See fencing permit |
| Add/modify components | To add a floor or annex or modify a licensed building |
| Existing building status correction | For a building without a permit or contrary to it |
What a Building Fasah Contains
- Owner, plot and survey decision details.
- Building use: residential, commercial or mixed.
- Number of floors and approved areas per floor.
- The design office, supervisor and contractor.
- Issue and expiry dates.
How a Building Fasah Is Issued Today
- Authorise an accredited engineering office on Balady.
- Issue a survey decision for building.
- Prepare architectural, structural and MEP drawings.
- Submit the application on Balady and resolve comments.
- Pay the fees and issue the permit.
For the owner's perspective, read how to get a building permit.
Terms Related to the Fasah
| Term | Meaning |
|---|---|
| Survey decision | A document of the plot's boundaries and area for a specific purpose, required before the fasah |
| Approved plan | The neighbourhood planning layout defining uses and setbacks |
| Occupancy certificate | Issued after construction is completed according to the fasah |
| Permit extension | Extending the fasah's validity if construction is not complete |
| Permit ownership transfer | Transferring the fasah to a new owner when the plot is sold before completion |
What Determines What the Fasah Allows?
- Plan requirements: permitted floors, building ratio and setbacks.
- Street width: affects allowed height and commercial use.
- Use: residential, commercial or mixed.
- Parking: spaces required by use and area.
- The Saudi Building Code: structural, safety and energy requirements.
So an attractive design may be rejected because it exceeds the building ratio or falls one metre short of a setback. Knowing the requirements before drawing saves revision time.
Does the Fasah Differ Between Cities?
The platform and procedure are unified through Balady, but planning requirements differ between cities and neighbourhoods, and permit fees vary by municipality category. What is allowed in one Riyadh neighbourhood may differ from another in the same city.
Building Without a Fasah: The Risks
- Stop orders and fines, possibly up to removal.
- Difficulty connecting services and no occupancy certificate.
- Complications in selling, mortgaging or financing.
- The later fix is usually status correction, which is longer and costlier than a fasah from the start.
Building Fasah with Abak Engineering Consultancy
Abak issues all types of fasah: new building, restoration, demolition, fencing, additions and status correction, from the survey decision and design to permit issuance.
Request the service: Building permit service | 0531145777
Frequently asked questions
What is a building fasah?
It is the building permit issued by the municipality, allowing construction according to approved drawings.
Are the fasah and the building permit the same?
Yes in common usage; the official term today is building permit.
How long is a building fasah valid?
3 years for a new building permit, and it can be extended.
Do I need a fasah to build an annex or rooftop room?
Yes. Any addition needs the add/modify building components service.
How do I know if a building has a fasah?
Through Balady's building permit inquiry service using the permit number and owner ID.
Does Abak issue all types of fasah?
Yes, all construction permits through Balady.