The Real Estate General Authority (REGA) notes that its sorting service covers commercial, residential and mixed-use properties. This means shops and offices in eligible buildings can obtain independent deeds, opening sale and financing options for owners and developers instead of relying on leasing alone. But commercial units differ from residential apartments in important details: parking, frontages, shared corridors and the boundaries of the unit itself. This guide explains what differs in sorting commercial units, shared management after sorting, and tips for developers before design.

What Differs for Commercial Units?

  • Common parts: entrances, corridors, parking and roofs are set in the sorting record. REGA notes that the service determines the common areas between units such as parking, corridors and roofs.
  • Meters: an electricity meter per unit and a meter for the common parts are requirements.
  • Parking: is it shared or assigned to specific units?
  • Use: must match the building permit.
  • Unit boundaries: open-plan offices or combined shops need clear boundaries on the plan.

Table: Residential vs Commercial Units in Sorting

ItemResidential apartmentShop or office
Unit boundariesUsually fixed wallsMay be open or combinable
ParkingShared or assignedOften a value item needing precise definition
FrontageLess importantAffects value and signage. Read: Commercial facade requirements
Common partsStairs, lift and roofCorridors, services and public entrances
UseResidentialMust match the permit. Read: Changing a shop's activity

After Sorting: Shared Management

Sorted buildings need management of the common parts. REGA offers the "Mullak" programme for establishing owners' associations and organising property and facility management services. Read: The owners' association after sorting.

Tips for Developers

Design the commercial building from the start with clear unit boundaries, separate meters and defined common areas, and settle the sorting plan before selling. Read: Design mistakes that prevent sorting and The sorting plan before sales.

Common Mistakes

  • Selling shops before defining their boundaries and share of the common parts.
  • One meter for several shops.
  • Parking not defined on the plan, causing later disputes.
  • An actual use that differs from the permit.

Frequently Asked Questions

Can an office inside an office tower be sorted?

If the building meets the sorting requirements, office units are among what the service covers.

How is a unit's share of the common parts calculated?

Read: How is each unit's share of the common parts calculated?.

Does sorting raise a shop's value?

It allows sale and financing with an independent deed, which may be reflected in value. Read: Does sorting increase property value?.

Can two sorted shops be merged later?

This needs study and a regulatory procedure, so it is better to settle boundaries before sorting.

What are the official sorting requirements?

Read: Apartment sorting requirements.

How Abak Engineering Consultancy Helps

Abak is an accredited engineering office that surveys your commercial building, defines the unit boundaries, parking and common parts, prepares the sorting plan, and submits and follows the request with the competent authorities. See our service for filing sorting applications with the authorities, or contact us.

Regulatory information is based on the Balady platform and the Ministry of Municipalities and Housing, and procedures may be updated by the competent authority. Last reviewed: October 2026.