Site Preparation Permit
We obtain the site preparation permit that lets you ready the project plot before construction, under municipality requirements and the construction site manual.
- Professional Engineering Team
- Fast Service
- High Quality
- Trusted Engineering Solutions

What is this service?
An electronic service on the Balady platform granting authorisation to prepare and ready a project site before construction starts — preliminary excavation, levelling and setting up the site for execution — in line with municipality requirements and the manual for preparing and fencing construction sites. ABAK prepares the documents, files the application and follows it through to issuance.
Why do you need this service?
Prepares the site lawfully before execution begins.
Complies with the manual for fencing and preparing construction sites.
Avoids violations for working on site without authorisation.
Gets the project off to an orderly, safe start.
Service Preparation Steps
Defining scope
We define the scope of preparation works required.
Authorisation
ABAK is appointed as the engineering office on the Balady platform.
Documents
The required documents are prepared to the applicable site requirements.
Submission
The application is filed on Balady.
Clearing comments
We track review comments and align the file with the requirements.
Issuance
The site preparation permit is collected.
What does the service include?
Approved Standards & Codes
Frequently Asked Questions About This Service
What work does a site preparation permit cover?
The preliminary works before construction — initial excavation, levelling and setting the site up for execution — in line with the manual for preparing and fencing construction sites.
Do I need one if the building permit is already issued?
It is required when preliminary work starts before the building permit process is complete, or where the municipality requires it to regulate the project's start. The engineering office determines whether it applies to your case.
How does it relate to the fencing permit?
The two usually run together: fencing secures the site boundary while site preparation readies the ground for construction. Both regulate the project's start and protect the surroundings.
What is the risk of excavating without authorisation?
Beyond violations and a stop-work order, unregulated excavation can damage buried utilities or neighbouring buildings — and that liability rests entirely with the owner.
Why Choose abak?
We combine deep engineering expertise with high quality standards to deliver solutions you can trust.
Experienced Engineers
A team of certified consultants and engineers with long experience in the Saudi market.
High Quality Standards
Strict adherence to the Saudi Building Code and international engineering best practices.
Modern Engineering Solutions
We use the latest tools and technologies to deliver precise, efficient designs.
Professional Consultation
We listen to your needs and design the right solution for your project and budget.
Fast, Reliable Delivery
We commit to timelines and deliver our projects on schedule.
How We Work With You
Clear steps from first contact to final delivery.
- 1
Contact Us
Reach us on WhatsApp or by phone and share your project details.
- 2
Requirement Analysis
We study your needs and set a clear, suitable engineering plan.
- 3
Engineering Execution
Our team executes the work precisely to the highest standards.
- 4
Final Delivery
We hand over complete deliverables with post-delivery support.
Ready to Start Your Project?
Reach our team now on WhatsApp and get a consultation tailored to your service.
Related Articles

Occupying the Sidewalk with Construction Materials: Required Permit and Avoiding Violations
Rebar, blocks and sand on the sidewalk in front of a construction site is a familiar sight, but it is a municipal violation that exposes the owner and the contractor to fines and puts passers-by at risk.
Read article- Licenses & Certificates
Status Correction, Modification or Restoration? How to Choose the Right Permit for Your Existing Building
What delays owners of existing buildings most is not the difficulty of the procedure, but choosing the wrong service from the start. This guide helps you identify the right service with three questions.
Read article - Licenses & Certificates
Transfer of Building Permit Ownership: When You Need It and How to Apply
When you buy land for which a permit was issued, or a building under construction, the permit remains in the previous owner's name until you transfer it. This blocks any later service that requires the permit to be in your name: renewal, modification or the occupancy certificate. The solution is…
Read article 
Restoration vs. Modification vs. Addition: Which Permit Fits Your Works?
The most common mistake owners make when altering their buildings is choosing the wrong permit. Here is a comparison table based on the definitions of Balady's services.
Read article