The most common mistake owners make when altering their buildings is choosing the wrong permit: applying for restoration when the work is an addition, or for a modification when the building already breaches its permit, so the application comes back and time is lost, or carrying out work without a permit thinking it is "minor". This guide gives a comparison table based on Balady's service definitions, a quick rule for telling them apart, practical examples of the most common cases, and questions that settle the route before you start.

Comparison Table

ServiceOfficial definition in briefBasic condition
Restoration permitTechnical repair to restore the previous condition, without adding a new component or changing structural elementsA valid building permit
Adding and modifying building componentsAdding, modifying and removing building components in the permitA building permit
Existing building status rectificationIssuing a permit for an existing building, with the municipality calculating any finesA building permit or a survey decision for rectification

A Quick Rule

If the work adds, changes or removes a component, it is a modification. If it repairs without change, it is restoration. If the building exists without a permit or breaches it, start with status rectification.

Examples to Determine the Route

WorkRoute
Repairing cracks and leaksRestoration
Re-rendering, painting and waterproofingRestoration
Adding a floor and removing an annexAdding and modifying components (per Balady's answer)
Opening a new shop or door onto the streetAdding and modifying components
Adding a lift or parkingAdding and modifying components
An old building with no permit that I want to modifyStatus rectification after a survey decision for the same purpose
An existing annex built without a permitUsually status rectification
Strengthening damaged columnsNot restoration by definition; the office sets the route with a structural report

Why Does the Distinction Matter?

  • Time: an application for the wrong service comes back and you start again.
  • Compliance: work outside a permit's scope is a violation even if you hold another permit. Read: Fines for non-compliant buildings.
  • Safety: structural work needs assessment and design that simple restoration does not.
  • Later services: occupancy, sorting and sale depend on the building matching its permit.

Questions That Settle the Route

  1. Does the building have a permit visible on Balady? If not, start with status rectification or data correction. Read: Old permit not showing.
  2. Does the current building match its permit?
  3. Does the work change areas, openings, floors or use?
  4. Does the work touch columns, beams, slabs or load-bearing walls?

For the full route using three questions: Which permit does an existing building need?

Frequently Asked Questions

Can restoration and addition be combined?

Each service has its scope; the engineering office determines the right route based on the works.

Is renewing a facade restoration or modification?

Restoring the facade as it was is restoration; changing its design or making new openings is modification. Read: Facade restoration and renewal.

Is removing an internal wall a modification?

If it is load-bearing, it is a structural change needing assessment and modification; if not, the office defines its scope.

Read more about each service

See: The restoration permit, Modifying building components, and Status rectification and fines.

How Abak Engineering Consultancy Helps

Abak is an accredited engineering office in Riyadh that identifies the right service for your works from the start, prepares the drawings and reports, and handles the permit. Learn about our adding and modifying components service, or contact us.

Regulatory information is based on the Balady platform and the Ministry of Municipalities and Housing, and procedures may be updated by the competent authority. Last reviewed: October 2026.