When a facility is registered on the Salamah Portal, the owner or manager may see more than one licensing route. Some activities can complete the process through a safety equipment certificate or an instant route, while other activities are placed under the non-immediate report route. This means that the facility requires a technical safety report supported by an inspection and engineering review before the application can be completed.
A non-immediate safety report is one of the most frequently requested documents because it is often confused with an instant report, a safety certificate or a technical report issued through the Balady Platform. Each document serves a different purpose, has a different approving authority and follows its own requirements.
In this guide, ABAK Engineering Consultancy explains what a non-immediate safety report means, when it is requested through the Salamah Portal, what the technical report includes, how an approved engineering office supports the process and why applications may be rejected.
What Is a Non-Immediate Safety Report?
A non-immediate safety report is a technical report prepared by an engineering entity approved for fire prevention and protection services. The office reviews the facility information, inspects the site and checks the existing safety systems. The report is then submitted through the appropriate route on the Salamah Portal to support the issuance or renewal of a Civil Defense-related license.
The term “non-immediate” does not simply mean that the process is slow, and it does not automatically mean that the facility is in violation. It means that the activity or facility cannot rely only on an electronic declaration or a basic safety equipment certificate. Instead, it requires documented technical verification of its compliance with fire prevention and protection requirements.
The non-immediate report may include a site inspection, photographs of safety elements, drawing reviews, system testing, recorded observations and corrective actions that must be completed before the report is submitted or approved.
When Does the Salamah Portal Request a Non-Immediate Report?
The required route is determined by the facility activity classification and the data registered on the Salamah Portal. The activity type, facility area, risk level, occupancy, number of floors, stored materials and required fire protection systems may all affect the required process.
A non-immediate report may be requested for:
- Activities with higher risks or special technical requirements.
- Large, multi-story or wide-area facilities.
- Facilities using flammable materials or storing significant quantities.
- Facilities requiring alarm, firefighting or fire pump systems.
- Facilities that cannot rely on a safety equipment certificate alone.
- Facilities requiring approved safety drawings before licensing.
- Facilities with previous observations or changes in use or activity.
- Applications requiring technical evidence of the existing fire protection systems.
The route cannot be determined solely from the activity name. The practical reference is the requirement displayed by the Salamah Portal after the facility information is entered.
Instant Report vs. Non-Immediate Report
| Comparison | Instant Route | Non-Immediate Report Route |
|---|---|---|
| Process | A simpler process allowed for certain activities | A process requiring technical review and documented reporting |
| Site inspection | May not be required in some cases | Often required depending on the activity and application |
| Main document | Declaration, safety equipment certificate or simplified requirement | Technical safety report or compliance report for fire prevention and protection |
| Drawings | May not be required for certain activities | Architectural, electrical and mechanical safety drawings may be required |
| Engineering office role | May be limited according to the service | Site review, document review, report preparation and technical follow-up |
| Reason for the route | Lower technical requirements or lower risk level | Need for more detailed engineering verification |
A non-immediate route does not automatically mean that the facility is unsuitable or that the license will be rejected. It means that the authority requires more technical information and verification before completing its review.
What Does a Non-Immediate Safety Report Include?
The report scope varies according to the facility, but a professional technical report should define the inspection scope, documents reviewed, systems checked, observations recorded and final technical conclusion.
A non-immediate safety report may include the following elements:
General Facility Information
- Facility name and owner or operator details.
- Site address and building information.
- Activity type shown in the official documents.
- Facility area, floors and occupied spaces.
- Permit and commercial registration details where required.
- Details of the engineering office preparing the report.
Site Access and External Areas
- Access for Civil Defense vehicles.
- Facility entrances and external movement routes.
- Evacuation and assembly areas where applicable.
- Obstructions that may affect access or evacuation.
- Facility identification and directional signs.
Emergency Exits and Evacuation Routes
- Number and location of exits.
- Clear and unobstructed escape routes.
- Opening direction of emergency doors.
- Exit signs and emergency lighting.
- Stairs, corridors and ramps where applicable.
- Compliance of the internal layout with evacuation requirements.
Fire Alarm Systems
- Fire alarm control panel.
- Smoke and heat detectors.
- Manual call points.
- Audible and visual notification devices.
- Backup power supply.
- Test results and maintenance records where available.
Firefighting and Fire Protection Systems
- Fire extinguishers, distribution and validity.
- Fire hose cabinets and hose reels.
- Automatic sprinkler systems where required.
- Fire pumps and water tanks.
- Civil Defense connections.
- Special extinguishing systems for kitchens, equipment rooms or sensitive areas.
Ventilation and Smoke Control
Some facilities require a review of ventilation and smoke control systems, particularly large buildings, basements and areas with high occupant density. The required scope depends on the building design, occupancy and systems required under the applicable code and regulations.
What Is the Role of an Approved Engineering Office?
The approved engineering office begins by understanding the requirement displayed on the Salamah Portal and confirming the report scope. The office then reviews the available documents and schedules a site inspection when required.
During the inspection, the engineer reviews visible safety elements, drawings and installed systems, photographs observations and compares the actual condition with the submitted documents. A professional report is not merely an electronic form; it should clearly reflect the actual condition of the facility and provide verifiable technical evidence.
The engineering office may perform the following tasks:
- Review the facility activity, area and registered information.
- Identify the technical requirements related to the facility classification.
- Inspect the site and document safety systems with photographs.
- Review existing drawings and installed systems.
- Prepare observations and corrective action recommendations.
- Review alarm and firefighting system test results.
- Prepare, stamp and sign the technical report according to the requirements.
- Submit the report through the correct Salamah Portal route.
- Follow up on observations and responses until the application is completed.
Documents That May Be Required
Documents vary from one facility to another, but preparing the file in advance reduces delays and makes the inspection more efficient. The required or useful documents may include:
- Business or municipal license.
- Commercial registration and facility information.
- Site and national address details.
- Available safety drawings.
- Architectural, electrical and mechanical drawings where required.
- Maintenance certificates for alarm and firefighting systems.
- Test results for pumps, sprinklers and special systems.
- Recent photographs of facades, exits and systems.
- Previous reports or observations issued by the authority.
- Details of the engineering office or safety company responsible for the systems.
Having the documents does not guarantee automatic approval, but it helps the engineering office verify the information and identify issues before submission.
Why Are Non-Immediate Safety Reports Rejected?
1. Inconsistent Facility Information
This occurs when the area, address or activity differs between the Salamah Portal, the municipal license and the commercial registration. The information should be aligned or the reason for the difference should be clarified before submission.
2. Incorrect Activity Classification
The activity classification affects the required safety systems. If the registered activity does not reflect the actual use of the facility, the application may show unsuitable requirements or be returned for review.
3. Incomplete Safety Systems
An alarm or firefighting system may exist but remain incomplete, untested or improperly operational. Fire extinguishers may also be expired, insufficient or incorrectly distributed.
4. Drawings That Do Not Match the Site
A common mistake is uploading old drawings that do not show recent modifications or the actual locations of exits and safety systems. Matching the drawings with the existing facility is essential before preparing the report.
5. Missing Photographs or Supporting Documents
The report may be returned if it does not include sufficient photographs of the facades, systems and observations, or if test results and supporting documents are missing where required.
6. Using an Unapproved Provider
The engineering office or safety company should be verified for the specific service scope before signing an agreement. Approval in another activity does not necessarily mean that the provider is authorized to prepare the required safety report.
7. Unresolved Observations
If important observations are recorded and not corrected or documented as closed, the application may remain incomplete until the conditions are corrected and another inspection is performed where necessary.
How to Prepare the Facility Before Inspection
You can reduce delays and improve the quality of the report by preparing the facility before the inspection. Make sure that exits and evacuation routes are clear, emergency doors can open, fire extinguishers are properly distributed and secured, and exit signs and emergency lighting are operational.
It is also useful to prepare maintenance and testing records, make the available drawings accessible, assign a responsible person to accompany the engineer and provide access to pump rooms, tanks, alarm panels and technical areas.
Non-Immediate Report vs. Safety Equipment Certificate
A safety equipment certificate generally focuses on confirming the availability of specific safety tools or requirements under the route allowed by the platform. A non-immediate safety report has a wider scope because it may require a technical review of the facility, including alarms, firefighting systems, emergency exits, drawings and test results.
The owner cannot replace a non-immediate report with a safety equipment certificate when the Salamah Portal specifically identifies the technical report as a required document. The requirement displayed by the platform determines the correct route.
How ABAK Engineering Consultancy Can Help
ABAK Engineering Consultancy can help prepare a non-immediate safety report and identify the technical requirements before the process starts. The work begins by reviewing the facility activity, area and registered information, then defining the inspection scope and required documents.
After the inspection, observations and technical recommendations are documented. The safety systems and drawings are reviewed where required, and the report is prepared and submitted through the Salamah Portal. The team can also follow up on observations until the requirements are completed.
ABAK can additionally support related services such as safety drawings, fire system drawing reviews, compliance reports, Civil Defense observations and coordination of the required technical works.
Frequently Asked Questions
What does non-immediate report mean on the Salamah Portal?
It means that the activity requires a more detailed technical review than the instant route. The process may include a site inspection, safety system review and drawing verification before the license can be completed.
Does a non-immediate report mean that the facility has failed?
No. A non-immediate report is a technical assessment route, not a decision that the facility is unsuitable. Approval depends on meeting the requirements and correcting the recorded observations.
Can a non-immediate report be issued without a site visit?
This depends on the activity and the requirement displayed in the application. However, non-immediate reports commonly involve a site inspection and technical documentation, especially when the authority needs to verify existing safety systems.
Does a Balady technical report replace a non-immediate safety report?
No. A Balady technical report is related to construction permits and municipal services, while a non-immediate safety report relates to fire prevention and protection requirements through the Salamah Portal.
Are approved safety drawings required?
Some facilities require approved safety drawings depending on their area, activity and installed systems. The engineering office should determine the required drawing scope after reviewing the application and inspecting the site.
What helps speed up report approval?
Consistent facility data, complete documents, operational safety systems, early correction of observations and appointing an approved engineering office for the correct service scope all help reduce delays.