Abak
Matching the blueprints with the Saudi Building Code and Baladi platform requirements

Matching the blueprints with the Saudi Building Code and Baladi platform requirements

Engineering Creativity and Sustainable Safety

Last updated on February 20, 2026

Matching the blueprints with the Saudi Building Code and Baladi platform requirements

If you want to issue a building permit or approve an architectural plan quickly, the most important factor is not only the beauty of the design, but the conformity of the plans to the Saudi Building Code and the requirements of the Baladi platform.

Many license applications are rejected or returned for modification due to minor irregularities in recoils, elevations, safety or insulation, which leads to project delays and loss of time and money.

This service aims to review and correct the schemes before applying so that they are accepted from the first time without notes.

Why is the scheme rejected in my platform

The most common reasons for refusal are:

Violation of regular bounces

Increase the percentage of construction

The height of the roles is higher than allowed

Privacy-violating openings and windows

Lack of thermal insulation requirements

Non-conformity of stairs and emergency exits

Errors in floor levels

Insufficient car parking

Non-compliance with the requirements of people with disabilities

Chart performancereferences

These notes may repeat the transaction several times.

What is being reviewed in the service

1) architectural requirements

Systemic reflux

Build ratio

Role Heights

Openings and protrusions

Fences and enclosures

2) safety requirements

Stairs

Escape exits

Fireproof doors

Movement paths

3) thermal insulation

Wall thicknesses

Type of material

Windows and glazing

Compliance with energy efficiency requirements

4) regulatory requirements

Parking lots

Slopes for people with disabilities

Service rooms

Locations of counters

What do you benefit from matching before applying

Accepting the license from the first time

Speeding up the issuance of a building permit

Avoid costly adjustments

Prevent stopping the transaction

Correct on-site execution

Raising the value of the property

Service outputs

After the review you get:

Detailed feedback report

Corrected schemes

Full conformity to the building code

The file is ready for submission in my platform

Reduce the likelihood of rejection of the application

Who is this service for

This service is suitable for:

Landowners before issuing a license

Whose scheme was previously rejected

Real estate offices and developers

Who wants to build without future problems

Who wants to finish the procedures quickly

The success of the building permit depends on the accuracy of the scheme before it is filed, and not after the observations.

Matching the blueprints to the Saudi Building Code and the requirements of the Baladi platform is an essential step that shortens weeks of delay and avoids modification costs during implementation.

If you intend to build or apply for a license, start with a professional engineering review to ensure that the scheme is approved directly without complications.

Thank you for taking the time to read this article.

If you enjoyed the article, feel free to share it or keep exploring more.

Discover More