Quick answer: A restoration permit is an electronic licence from the Balady platform to return a building to its previous good condition by repairing one or more defects, without adding a new component and without changing structural elements. Its requirements are a building permit (or survey decision), a contract with an engineering office, and payment of the fee. In Riyadh the fee is SAR 1.5 per square metre for residential buildings, and the service takes 1 to 10 days.

Before you repair cracks, replace insulation or renew a façade, you need to know whether a restoration permit is enough, or whether your work counts as a modification requiring another service. This guide from Abak Engineering Consultancy answers that based on the official service description from the Ministry of Municipalities and Housing.

What is a restoration permit?

The ministry defines the Building restoration permit issuance service as an electronic service on Balady whose purpose is to restore the building to its previous good condition through technical repair to address one or more defects for its sustainability, without adding a new component or changing the building's structural elements, and without visiting the authority.

Examples of works usually covered by a restoration permit

  • Treating non-structural cracks in walls and plaster.
  • Renewing roof waterproofing or thermal insulation.
  • Repairing and re-cladding façades with the same design.
  • Renewing internal plumbing or electrical networks without changing areas.
  • Repairing floors and tiles.

When is a restoration permit not enough?

Your workCorrect service
Adding an annex, room or floorAdd and modify building components
Changing columns, beams or slabs (structural elements)Add and modify building components with structural design
Demolishing the whole buildingDemolition permit
An old unlicensed building you want to regulariseExisting building status-correction permit

Restoration permit requirements

According to the ministry's service page, there are three requirements:

  1. A building permit.
  2. A contract with an engineering office.
  3. Payment of the service fee.

The page states that the service requires no documents to be uploaded by the owner. The service steps also allow selecting the building permit or survey decision to be restored.

Steps to obtain a restoration permit on Balady

  1. Go to the dashboard and select your user role.
  2. Start via "New application".
  3. Specify the owner type and applicant.
  4. Select the building permit or survey decision to be restored.
  5. Select the engineering office.
  6. Undertake to remove the debris.
  7. Send the application to the engineering office.
  8. The office completes the data and prepares the drawings.
  9. The payment invoice is issued.
  10. After payment the permit is issued and can be printed.

Processing time: 1 to 10 days according to the service page. You can also apply via the Municipal Store.

Restoration permit fees (official table)

According to the Municipal Services Fees Regulation, the fee for issuing or extending a building restoration permit, valid for one year:

Building typeCategory 12345Unit
Residential1.501.200.900.600.30SAR/m²
Residential-commercial2.001.601.200.800.40SAR/m²
Commercial3.002.401.801.200.60SAR/m²
Wall1.000.800.600.400.20SAR/linear m

Example: restoring a residential villa in Riyadh with 400 m² of built-up area → 400 × 1.5 = SAR 600 municipal fee, plus the engineering office's fees and the cost of the restoration works themselves. The final figure for your property appears in Balady's fee calculator, with payment via mada, Mastercard or SADAD.

To compare with building, demolition and occupancy fees: Building permit fees 2026.

Restoration permit for a rented commercial shop

A common question in Balady's FAQ: is a permit needed to restore a rented shop? The answer is yes, and you can apply for a restoration permit for a commercial shop under the building permit of the building you rent from. In other words, the application is based on the building permit, not the lease alone. Coordinate with the building owner to obtain the permit details.

Building restoration and the Saudi Building Code

The Saudi Building Code is not limited to new buildings; it covers existing buildings undergoing restoration, change of use, extension or modification. Materials and repair methods must therefore comply with the code, which is one reason the service requires an engineering office.

Disposing of restoration debris

The service steps include an undertaking to remove debris. The ministry's requirements for disposing of construction, demolition and restoration waste include contracting a licensed transporter and providing a container. Leaving waste in the street or on vacant plots is a municipal violation.

Tips before applying for a restoration permit

  • Diagnose the defect first: some cracks are symptoms of a structural problem in the foundations. The engineering office determines whether restoration is enough or structural treatment is needed.
  • Do not add any component under the cover of restoration; the permit does not cover additions.
  • For commercial buildings: check safety and civil defense requirements. See our civil defense permits service.
  • Keep the permit on site to show during any inspection.

Restoration, modification or status correction? A decision table

QuestionIf the answer is yes
Will you add a room, annex or floor?Not restoration → Add and modify building components
Will you change a column, beam or slab?Not restoration → modification with structural design
Does the building have no permit at all?The service allows selecting the survey decision; if the aim is to regularise the building, the path is status correction
Is the work a repair returning the building to its condition?Restoration permit ✔

Common restoration permit scenarios

An old villa needing a full finishes renewal

Renewing tiles, paint, plumbing and electrics without changing areas usually falls under restoration. But if the renewal involves opening walls between rooms, ask the office to assess whether these walls are load-bearing.

Water leakage and roof damage

Diagnose the cause first: damaged waterproofing, or a structural crack in the slab? Waterproofing is restoration; a structural crack needs an engineering report that may change the service type.

A commercial shop wanting to renew its façade

Coordinate with the building owner to obtain the building permit, since the restoration permit for a rented shop is issued under it. Check safety requirements if the renewal includes ceilings or electrical installations.

A dilapidated boundary wall

Wall restoration has a separate fee per linear metre (SAR 1 per metre in Category 1). If the scenario is building a new wall, that is a fencing permit. Read Land fencing permit.

The real cost of restoration: beyond the municipal fee

The municipal restoration fee is relatively small. The real budget consists of:

  • The engineering inspection and report that identifies defects and how to repair them.
  • Office fees for preparing drawings and submitting the application.
  • The municipal fee according to area and category.
  • The restoration works themselves: materials and labour.
  • Debris transport via a licensed transporter.

Terms you need to know

TermShort meaning
BaladyThe unified digital platform for municipal services, replacing visits to municipal offices for construction licences
Balady BusinessThe platform interface for engineering offices and contractors, from which the office submits applications
Survey decision (survey report)A document defining the plot's boundaries and dimensions on the ground, issued for a specific purpose such as construction or demolition
Design officeThe engineering office that prepares the designs and submits the permit application
Supervising officeThe office that verifies construction matches the drawings and submits construction reports
Technical inspectorA body that reviews drawings as part of the hidden defects insurance procedure and issues the safety confirmation certificate at the end
Hidden defects insuranceA policy covering defects that appear after construction and were not visible at handover
Occupancy certificateThe building completion certificate confirming the building's actual completion

Restoration permits with Abak

We inspect the building and determine the correct permit type (restoration, modification or status correction), then prepare the drawings, submit the application on Balady, and stay with you until the permit is printed.

Contact us: 0531145777 | Abak Engineering Consultancy

Frequently asked questions about restoration permits

How long is a restoration permit valid?

One year under the fees regulation, extendable for a fee at the same rate.

How long does it take to issue a restoration permit?

The published service time is 1 to 10 days, excluding time to complete missing items.

Does a restoration permit require documents?

The service page states it requires no documents; the requirements are a building permit, a contract with an engineering office, and payment of the fee.

Can a restoration permit be issued for a commercial shop under a lease?

The application is made under the building permit of the building you rent from.

Does a restoration permit allow adding a room?

No. Restoration does not include adding new components or changing structural elements; additions use the Add and modify building components service.

Can a boundary wall be restored with a restoration permit?

Yes, walls have a separate restoration fee calculated per linear metre.

Does a restoration permit require hidden defects insurance?

The service page lists three requirements: a building permit, a contract with an engineering office, and payment of the fee.