Quick answer: A building permit is modified through the "Add and modify building components" service on Balady. The cost has three parts: the engineering office's fee for preparing revised drawings, the municipal fee calculated by Balady's fee calculator according to the type of modification, and any costs related to updating the insurance policy or supervision. The Municipal Services Fees Regulation does not set a separate fixed fee for modification.
Owners often want to change a building after the permit is issued: adding an annex, reducing floors or changing the façade layout. In this article from Abak Engineering Consultancy we explain how a building permit is officially modified, what determines the cost, and how to reduce it.
What is the Add and modify building components service?
According to Balady, it is an electronic service that allows the beneficiary to add, modify and delete building components in their permit without visiting the authority. It covers three cases:
- Addition: such as a rooftop or external annex, or an extra floor if the area's requirements allow.
- Modification: changing an existing component, such as changing the area or use of a part.
- Deletion: removing a component, such as reducing from two floors to one.
Steps to modify a building permit on Balady
- Go to the dashboard and select your user role.
- Choose the service via "New application".
- Specify the owner type and applicant.
- Select the building permit whose components you want to modify.
- Select the design engineering office (approved designer) or retrieve it from the insurance if insured.
- Select the supervising engineering office or retrieve it from the insurance.
- Select the building contractor or retrieve it from the insurance.
- Send the application to the engineering office.
- The engineering office completes the data and prepares the required drawings.
- A payment invoice is issued.
- After payment, the modified permit is issued and can be printed.
Components of the modification cost
| Item | Determined by | What raises or lowers it? |
|---|---|---|
| Engineering office fees | Your contract with the office | Size of the change, whether it affects the structure, and how many disciplines are affected |
| Municipal service fee | Balady fee calculator | Type of modification, affected area and municipality category |
| Insurance and technical inspection update | Insurer and technical inspector | Whether the change alters the structural design or insured areas |
| On-site works | Contractor | Construction stage at modification: before starting is far cheaper than after casting |
Important note on fees: the Municipal Services Fees Regulation sets the permit issuance fee per square metre (e.g. SAR 3 for residential in Riyadh), but it contains no separate item titled "permit modification". So do not rely on published figures such as "20–30% of the original fee". The correct figure for your case appears on the Balady payment invoice and in the fee calculator before applying. See the official building permit fees.
Common modification cases
Modifying a permit from two floors to one
This is a component deletion under the Add and modify building components service. Before applying, tell the engineering office whether you want to cancel the first floor permanently or build one floor now while keeping the option of a second later. The decision changes how the revised drawings are prepared. If construction has started, the structural design of foundations and columns may have been calculated for two floors, and the office needs to review what is required.
Adding a rooftop or external annex
A component addition. The cost depends on the annex area, its effect on the structural design, and the area's requirements (rooftop annex ratio and setbacks).
Modifying façades
If the change is aesthetic and does not change areas or structural elements, it may be simpler. Discuss it with the office first. For ideas read Modern house façade design.
An old building without a permit
You cannot modify a permit that does not exist. According to Balady, old unlicensed buildings apply for the existing building status-correction permit after a survey decision for the same purpose.
Repairs without additions or structural changes
This is not a permit modification but a restoration permit, with a lower fee.
How to reduce the cost of modifying a building permit
- Review the design carefully before the first issuance: the cheapest modification is the one you do not need. Ask the office for a review session with the family before submission.
- Modify before construction, not after: a change on paper is cheaper than demolishing cast concrete.
- Combine modifications in one application instead of several separate ones, each with its own fees.
- Use the same design office: it knows the building's structural calculations, and Balady lets you retrieve it from the insurance directly.
- Do not build the change before it is approved: construction that violates the permit exposes you to municipal penalties and may block the occupancy certificate later.
Does the modification affect the occupancy certificate?
Yes. The occupancy certificate confirms the building's actual completion and, for new applications, is issued through the supervising office after construction reports. Any difference between the built building and the approved permit blocks it, so the modified permit must reflect what was actually built. Read Building completion certificate.
When is a change a "modification" and when is it something else?
| Case | Classification | Service |
|---|---|---|
| Adding a rooftop room | Component addition | Add and modify building components |
| Cancelling the first floor of a two-floor permit | Component deletion | Add and modify building components |
| Enlarging a hall by removing a load-bearing wall | Modification affecting structural elements | Add and modify building components with structural design |
| Renewing plaster, paint and insulation | Repair without additions | Restoration permit |
| Converting an old unlicensed annex into a licensed one | Component not in the permit | Usually Add and modify building components; the office determines the path |
| A building with no permit at all | No permit to modify | Existing building status-correction permit |
Illustrative example: how a late modification adds up
An owner approved a two-floor villa design, then after casting the ground floor slab decided to cancel the first floor and add an external annex instead. What happens?
- Revising the architectural design to cancel the floor and add the annex.
- Reviewing the structural design: columns were designed to carry two floors, and the annex needs new foundations.
- An Add and modify components application on Balady, with the resulting fees on the invoice.
- Updating insurance data if the insured design changes.
- On-site works, which may include treating column starter bars protruding on the roof.
Had the same decision been made before the permit was issued, it would have been just a change on paper, usually within the design revisions included in the contract. The lesson: every week spent reviewing the design before the permit saves weeks and costs after it.
Checklist before applying to modify a building permit
- ☐ You have defined exactly what you want to add, modify or delete.
- ☐ You have confirmed the change is allowed under your area's requirements (setbacks, ratios, heights).
- ☐ You have combined all changes in one application.
- ☐ You have contacted the original design office if possible.
- ☐ You have told the contractor to stop affected works until approval.
- ☐ You have asked the office for a written fee estimate.
Terms you need to know
| Term | Short meaning |
|---|---|
| Balady | The unified digital platform for municipal services, replacing visits to municipal offices for construction licences |
| Balady Business | The platform interface for engineering offices and contractors, from which the office submits applications |
| Survey decision (survey report) | A document defining the plot's boundaries and dimensions on the ground, issued for a specific purpose such as construction or demolition |
| Design office | The engineering office that prepares the designs and submits the permit application |
| Supervising office | The office that verifies construction matches the drawings and submits construction reports |
| Technical inspector | A body that reviews drawings as part of the hidden defects insurance procedure and issues the safety confirmation certificate at the end |
| Hidden defects insurance | A policy covering defects that appear after construction and were not visible at handover |
| Occupancy certificate | The building completion certificate confirming the building's actual completion |
Modify your building permit with Abak
We review your current permit and the requested change, tell you whether it falls under adding and modifying components, restoration or status correction, then give you a written estimate separating our fees from municipal fees before starting.
Contact us: 0531145777 | Abak Engineering Consultancy
Frequently asked questions
How much does it cost to modify a building permit?
The Municipal Services Fees Regulation sets no fixed modification fee. The fee appears in the fee calculator and Balady invoice depending on the type of change and area, plus the engineering office's fees.
Do I need to visit the municipality to modify the permit?
No, the service is fully electronic via Balady without visiting the authority.
Can the permit be modified after construction starts?
Yes, but the cost is higher because the office needs to review what has been built, and the change may require additional on-site works.
Must it be the same design office?
Not necessarily; Balady lets you choose the designer or retrieve it from the insurance, but the same office is faster because it has the project files.
Can the first floor be cancelled after the ground floor is built?
Yes, by deleting the component through the Add and modify building components service, with a review of the structural design of what has been built.
Do I pay the full permit fee again when modifying?
The regulation does not state this as a separate item; the actual fee appears in the fee calculator and Balady invoice according to the modification.