Quick answer: According to Balady, the building completion (occupancy) certificate has three requirements: a building permit issued 6 months or more ago on which no occupancy certificate has been issued, payment of the service fee, and a hidden defects insurance policy. For new permits the certificate is issued through the supervising office after construction reports are submitted; for old permits you apply for the occupancy certificate service.

This article is practical and direct: the requirements, the steps, and a checklist before applying. If you want to know what the certificate is, its fees and how it differs from the compliance certificate, read first Building completion certificate: what it is and its fees. Prepared by Abak Engineering Consultancy.

Building completion certificate requirements (official)

#RequirementExplanation
1A building permit issued 6 months or more agoWith no occupancy certificate previously issued on it
2Payment of the service feeSAR 200 residential, 300 residential-commercial, 400 commercial
3A hidden defects insurance policyFor buildings required to be insured

Source: FAQ for the occupancy certificate service – Balady, and the Municipal Services Fees Regulation.

Unwritten but decisive practical conditions

  • The building matches the permit: the certificate confirms actual completion, so any unlicensed addition will show.
  • Completion of the works covered by the permit.
  • No outstanding municipal violations on the property.
  • Complete supervision reports for new permits.

Steps to obtain the building completion certificate

Route 1: new permits (through the supervising office)

According to Balady, for new applications the occupancy certificate is issued through the supervising office after construction reports (construction notifications) are submitted. The owner does not start a separate application; instead:

  1. The building is constructed under the supervising office registered on the permit.
  2. The supervising office submits construction notifications at each stage.
  3. Once reports are complete, the occupancy certificate path starts.
  4. The fee is paid and the certificate is issued.
  5. The building compliance certificate is issued proactively after the application is complete and paid.

Read about the supervisor's role in detail: Engineering supervision office.

Route 2: previously issued (old) permits

  1. Log in to the Balady portal or mobile app via the National Single Sign-On.
  2. Go to the dashboard and choose "Occupancy certificate issuance".
  3. Select the building permit for which you want the occupancy certificate.
  4. Complete the requirements (insurance for buildings that require it).
  5. Pay the fee.
  6. The certificate is issued, followed proactively by the compliance certificate.

The service is offered electronically only from the Balady portal dashboard or app and does not require visiting the authority.

The technical inspector's role

Balady states that after all requirements are complete, the technical inspector issues a safety confirmation certificate. The same inspector reviewed the drawings at the start of the project as part of the hidden defects insurance procedure. So a well-designed and well-built project goes through quickly.

Checklist before applying for the completion certificate

  • ☐ The permit was issued 6 months or more ago.
  • ☐ No occupancy certificate has been issued on this permit before.
  • ☐ The built building matches the approved drawings (floors, annexes, areas).
  • ☐ Any modification made was approved via the Add and modify building components service.
  • ☐ A hidden defects insurance policy exists (for buildings that require it).
  • ☐ The supervising office has submitted all construction notifications (for new permits).
  • ☐ No unpaid municipal violations.
  • ☐ The permit is valid or extended.

Common problems and solutions

I built an annex that is not in the permit

Resolve it before applying via the Add and modify building components service. Read Building permit modification cost.

The permit expired before construction finished

The permit is valid for three years and extended annually. Extend it first. Read Building permit issuance and validity.

The permit is old and does not appear on Balady

Read Fixing an old permit that does not appear on Balady.

The building is old and has no permit at all

An occupancy certificate cannot be issued without a permit. The path is an existing building status-correction permit after a survey decision, or see the route for a compliance certificate for existing buildings.

The building was sold and the permit is in the previous owner's name

Transfer the permit's ownership first: Transferring building permit ownership.

Each requirement explained in detail

The six-month condition

The service requires the permit to have been issued 6 months or more ago. The logic is that a building is not expected to be actually completed in a shorter period. If your construction finishes early, plan the remaining certificate requirements during this period so you can apply as soon as it is complete.

No previous occupancy certificate on the permit

The certificate is issued once per permit. If it has already been issued, it is not requested again on the same permit.

The hidden defects insurance policy

The policy is issued before the building permit and activated after occupancy. Balady states it is a core requirement before applying for a building permit for residential and commercial buildings. For applications issued before 25/6/2025, the building contractor applies for the insurance policy via Balady Business.

Paying the fee

SAR 200 for residential, SAR 300 for residential-commercial and SAR 400 for commercial, as a fixed fee per certificate in all municipality categories.

Who does what in obtaining the completion certificate?

PartyRole
OwnerEnsuring the building matches, paying, and applying for old permits
Supervising officeSubmitting construction notifications, and triggering the occupancy path for new permits
ContractorCompleting the works, and its part of the insurance policy
Technical inspectorIssuing the safety confirmation certificate once requirements are complete
Balady platformIssuing the certificate, then the compliance certificate proactively

Tips to speed up the completion certificate

  • Think about the certificate from the day of the permit: matching is easier when considered during construction.
  • Do not build any change before it is approved: every unapproved change needs fixing before the certificate.
  • Follow construction notifications with the supervisor stage by stage, not all at once at the end.
  • Make sure the permit is valid: extend it before it expires if construction takes longer.

Terms you need to know

TermShort meaning
BaladyThe unified digital platform for municipal services, replacing visits to municipal offices for construction licences
Balady BusinessThe platform interface for engineering offices and contractors, from which the office submits applications
Survey decision (survey report)A document defining the plot's boundaries and dimensions on the ground, issued for a specific purpose such as construction or demolition
Design officeThe engineering office that prepares the designs and submits the permit application
Supervising officeThe office that verifies construction matches the drawings and submits construction reports
Technical inspectorA body that reviews drawings as part of the hidden defects insurance procedure and issues the safety confirmation certificate at the end
Hidden defects insuranceA policy covering defects that appear after construction and were not visible at handover
Occupancy certificateThe building completion certificate confirming the building's actual completion

Obtain your completion certificate with Abak

We check the building against the permit before applying, resolve differences through the right service, and follow the occupancy path until the certificate and compliance certificate are issued. If we supervise your project, we submit construction notifications on time so occupancy is not delayed.

Call us: 0531145777 | Abak Engineering Consultancy

Frequently asked questions

What are the requirements for the building completion certificate?

A permit issued 6 months or more ago with no occupancy certificate on it, payment of the fee, and a hidden defects insurance policy.

Who applies for the completion certificate for new permits?

It is issued through the supervising office after construction reports (construction notifications) are submitted.

Can the completion certificate be obtained less than 6 months after the permit?

The service requires the permit to have been issued 6 months or more ago.

What is issued after the completion certificate?

The building compliance certificate is issued proactively, and the hidden defects insurance policy is activated.

What should I do if the completion certificate application is rejected?

Check the reason: usually missing requirements or non-matching. Resolve it through the appropriate service and reapply.

Must the permit be valid when applying for the certificate?

Make sure it is valid, and extend it before it expires if construction takes longer.

Official sources