Short answer: A ready-made evacuation plan is a useful starting point, but it is not enough on its own. A plan accepted by Civil Defense is built on your actual building: its exits, routes, number of occupants and safety systems, together with an evacuation drawing for each floor. This article gives you a complete template of the plan's contents and what must be tailored to your facility.
For the concept and requirements of evacuation plans, see evacuation plans in Saudi Arabia.
Key Points
- The plan has two parts: a written procedures document, and an evacuation drawing posted on each floor.
- A ready-made template does not know how many exits you have or where your extinguishers are.
- The plan needs an emergency team with named members and roles.
- Without training and drills, the plan stays on paper.
Evacuation Plan Template: Contents
1. Facility details
Name, activity, address, number of floors, area, maximum occupancy and working hours.
2. Risk analysis
Potential fire sources, flammable materials, hazardous areas, and groups needing assistance.
3. Available safety systems
Alarms, extinguishers, sprinklers, emergency lighting, signage and their locations.
4. Emergency team
| Role | Task |
|---|---|
| Emergency coordinator | Announce evacuation and liaise with Civil Defense |
| Floor wardens | Guide occupants and confirm the floor is clear |
| First-response fire team | Use extinguishers on small fires only |
| First aider | First aid at the assembly point |
| Headcount officer | Count people at the assembly point |
| Assistants for people with disabilities | Accompany those who need help evacuating |
5. Evacuation procedures step by step
- Activate the alarm on discovering a fire.
- Call emergency services: 911 in the Makkah, Madinah, Riyadh and Eastern regions, and 998 elsewhere.
- Head to the nearest safe exit and do not use lifts.
- Close doors behind you without locking them.
- Gather at the assembly point for the headcount.
- Do not re-enter the building until Civil Defense allows it.
6. Emergency numbers and contacts
7. Training and drill schedule
What the Evacuation Drawing Must Show
- A "You are here" marker where the drawing is posted.
- Evacuation routes with arrows to the two nearest exits.
- Locations of extinguishers, alarm call points, hose reels and first aid.
- Stairs, emergency exits and the assembly point.
- A clear legend and correct orientation.
Evacuation Plans by Facility Type
| Facility | Added to the plan |
|---|---|
| Schools | Evacuation by class, escorting young pupils, assembly point away from vehicles |
| Hospitals and clinics | Horizontal evacuation for patients unable to move |
| Warehouses | Isolating energy sources and keeping moving equipment off routes |
| Collective housing | Instructions in residents' languages and headcount by room |
| Offices | A warden per floor and an assembly point for visitors |
How to Run a Successful Drill
- Brief the emergency team in advance and set a scenario: a fire in a specific location.
- Sound the alarm and start timing.
- Watch the routes: did occupants use the nearest exit? Did anyone use the lifts?
- Record when the last person reached the assembly point and how accurate the headcount was.
- Collect observations and update the plan.
Common Mistakes in Evacuation Plans
- An evacuation drawing oriented wrongly for where it is posted.
- Routes passing through a storeroom or a locked door.
- An assembly point in the car park.
- An emergency team listing staff who have left.
- No provision for people with disabilities and visitors.
Why a Ready-Made Plan Is Not Accepted As Is
- Escape distances and the number of exits differ between buildings and are calculated per the code.
- The drawing must match the actual building at inspection.
- Emergency team names and responsibilities are specific to your facility.
- Some activities have additional requirements: schools, hospitals, warehouses and collective housing.
Evacuation Plans with Abak Engineering Consultancy
We prepare the evacuation plan and floor-by-floor evacuation drawings based on your building's plans and a site visit, according to Civil Defense requirements and the Saudi code, and review escape distances and exits.
Request the service: Evacuation plans service | 0531145777
Frequently asked questions
Is there a ready-made evacuation plan I can use?
A template can be a starting point, but it must be tailored to your building with its own evacuation drawing.
What is the difference between an evacuation plan and an evacuation drawing?
The plan is a procedures and responsibilities document; the drawing shows routes, exits and equipment for each floor.
Where should the evacuation drawing be posted?
At entrances, main corridors and next to stairs and lifts on each floor.
How often should an evacuation drill be held?
Periodically according to the facility type and the supervising authority, and at least once whenever the plan is updated.
Is an evacuation plan required for a Civil Defense licence?
It is required for many activities, as determined by the Salamah platform based on activity and area.
Does Abak prepare evacuation drawings?
Yes, a plan and drawings for each floor according to Civil Defense requirements.



