Quick answer: A survey decision (survey report) is issued electronically through the Balady platform and prepared by an engineering office the owner authorises from the dashboard or the Municipal Store app. The owner specifies the decision's purpose (construction, demolition, fencing…), the office uploads the survey work, then the fee is paid and the decision is issued and printed from the beneficiary's account. It is valid for 3 years.

The survey decision is the first document in any project on your land: no building, demolition or fencing permit without it. Yet many owners are delayed at this step because of a wrong authorisation or an unsuitable purpose. In this guide from Abak Engineering Consultancy we explain how to authorise an engineering office to issue a survey decision according to Balady's procedures.

What is a survey decision?

Balady describes the Survey report issuance service as an electronic service that lets the beneficiary request a survey report for their property without visiting the authority. The platform uses "survey report" and "survey decision" for the same document.

The decision records the plot's boundaries, lengths, area and location on the ground as surveyed in the field by the engineering office, and is tied to a specific purpose. It is therefore the basis for all later permits.

Why must you authorise an engineering office?

Land surveying is field and technical work: measuring boundaries, lengths, angles and levels on the ground and matching them with the deed and approved subdivision plan. It is done by an engineering office providing surveying services, which uploads the results to Balady from its account. Authorisation is what allows the office to see your property and work on the request.

Steps to authorise an engineering office to issue a survey decision

  1. Contract the engineering office and ask for its name as it appears on Balady.
  2. Log in to Balady (platform or app) via the National Single Sign-On.
  3. From the dashboard choose your user role, then the survey report issuance service. According to Balady's FAQ, an engineering office can be authorised to issue a survey report through the Municipal Store app from the dashboard.
  4. Select the property (deed) for which the decision is needed.
  5. Specify the purpose of the survey decision: construction, demolition, fencing or others as the service allows.
  6. Select the engineering office and send the authorisation.
  7. The office accepts, visits the site to survey it, and uploads the work to the platform.
  8. Pay the fee when the invoice is issued.
  9. After payment the survey decision is issued and can be printed from your account.

For authorisation on other Balady services in general, read Authorising an engineering office on Balady.

Specifying the purpose: the most important choice in the request

A survey decision is issued for a specific purpose, and the purpose determines which permit can be built on it. Examples:

PurposeService it prepares for
ConstructionBuilding permit issuance
DemolitionDemolition permit, even for a building with no building permit
FencingLand fencing permit
Existing building status correctionStatus-correction permit for old unlicensed buildings

What if you chose the wrong purpose?

According to Balady, if you want to change the purpose of the survey decision, you can apply for the survey decision modification service before any permit is issued on the decision. So modification is possible as long as no permit has been built on it. Discuss your project with the office before authorising, especially if you plan to demolish and then build.

Survey decision validity

Balady states that a survey decision is valid for 3 years; when it expires you can apply for another survey decision for the same purpose.

Practical tip: do not issue the survey decision long before your project. If you issue it now and postpone construction for three years, you will need a new decision and new fees.

Old survey decisions that do not appear on Balady

Some owners have a survey decision issued from the municipality's system before the platform, which does not appear in their account. Balady's solution: there is a survey decision entry service available to engineering offices for entering old decisions issued from the municipality system. So you authorise an engineering office to enter it instead of issuing a new one, provided it is still valid for your purpose.

Survey decision fees

The municipal fee appears in Balady's fee calculator for your case and is paid via the payment invoice once the request is complete. Added to it are the engineering office's fees for the field survey and data preparation, a separate item in your contract. Ask the office to separate the two in writing.

Common mistakes that delay the survey decision

  • An outdated paper deed: start by updating it to an electronic deed. Read Updating paper deeds.
  • The ground differs from the deed: differences in lengths or boundaries between the actual plot and the deed. The office discovers this during surveying, and it may need resolving before the decision is issued.
  • Encroachments or neighbouring buildings overlapping the plot boundaries.
  • Choosing a purpose that does not suit the project.
  • Authorising the wrong property when you own more than one plot.
  • The owner delaying payment after the invoice is issued.

How to choose an office for land surveying

  1. An accredited engineering office registered with the Saudi Council of Engineers that provides surveying services.
  2. Modern survey equipment (such as survey-grade GPS and total stations) for accurate boundaries and levels.
  3. Quick site visits: the decision waits for the survey.
  4. Continuity: an office that issues the survey decision and continues with design and the permit saves you authorisations and file transfers between parties.

After the survey decision: the next step

  • For construction: the design office selects the survey decision when starting the building permit request on Balady Business. Read Building permit issuance.
  • For demolition: a decision for demolition is enough to issue a demolition permit even without a building permit.
  • For fencing: apply for the fencing permit based on it.

Survey decisions with Abak

We carry out the field survey with accurate equipment, upload the decision to Balady for the right purpose, and continue with design and the building or demolition permit in one file. We send you the office name as it appears on Balady and guide you through the authorisation steps.

Learn about the service: Abak's survey report service | Call: 0531145777

Frequently asked questions

Where do I authorise an engineering office to issue the survey decision?

From the Balady dashboard; authorisation to issue a survey report is available through the Municipal Store app from the dashboard.

How long is a survey decision valid?

3 years; after it expires you can issue another survey decision for the same purpose.

Can the purpose of the survey decision be changed?

Yes, through the survey decision modification service before any permit is issued on the decision.

I have an old municipality survey decision that does not appear on Balady; what should I do?

There is a survey decision entry service available to engineering offices for entering old decisions issued from the municipality system.

Is the survey decision the same as the survey report?

Yes, Balady uses both terms for the same document: the "Survey report issuance" service produces the "survey decision".

When can I print the survey decision?

After the fee is paid, the decision is issued and can be printed from the beneficiary's Balady account.

Official sources