Before you start building your factory in an industrial city, you need a building permit issued through MODON's building permits service, after the drawings are approved through the drawing approval service MODON offers engineering offices. This article explains the components of the usual technical file.
"How long does a building permit take at MODON?" Every investor planning a project schedule asks this. The precise answer depends on two things: the quality of the technical file, and how quickly comments are addressed.
Industrial land is not open space to build on as you please. MODON publishes building standards and requirements guides for industrial cities, the reference against which drawings are reviewed before approval. MODON describes the guide as a resource for knowing all building requirements in its industrial cities.
Drawings coming back with comments means extra weeks before the building permit. Most MODON comments on factory drawings come down to recurring causes that can be avoided by reviewing the file against MODON's guides before submission.
Food factories are among the most design-sensitive plants, because any flaw in zoning or finishes can mean contamination and rejected product. In industrial cities, these factories are subject to MODON's building and safety requirements, as well as the requirements of the food safety authorities for the activity.
Once construction is complete, a factory cannot start work without an operating license. MODON's terms state that this license means permission to operate the facility, that the licensee is the actual operator according to its legal entity, licenses and records, and that it may not assign the operation or the license to others.
Operation does not start with installing equipment but with completing the certificates. This is a checklist based on the attachments for the operating license application and the building completion and occupancy certificate as published by MODON.
The building completion and occupancy certificate, which serves as the first operating license for new factories, is issued once and for one year, according to MODON. After that comes the renewal of the operating license, a procedure that includes verifying safety standards.
Growing demand pushes many factories to expand: an extra production hall, a warehouse or an office floor. Inside an industrial city, expansion means modifying a licensed facility, and therefore following a regulatory route.
Adding a production line or changing the product is a business decision, but it is also a regulatory one. MODON's operating license terms state that the licensee is the actual operator according to its legal entity, licenses and records, and must comply with all of MODON's regulations, rules, terms and instructions. Any substantial change must be reflected in these licenses.
Over time, many factories need an extra warehouse, an office building, loading shades or worker housing. All of these are additions to a licensed industrial plot, and they go through the same building route at MODON.
A warehouse is not just a big box. The storage method determines the height, the spans, the floor type and the fire system. This is a guide to warehouse design.