When excavating for a basement or deep foundations next to an existing building, the soil under the neighbour's foundations can move. This is where shoring comes in.
The Ministry of Municipalities and Housing has approved the technical guide for car shades within the property line, which regulates permit issuance and design and construction requirements. These are the key conditions.
A car shade in front of the house protects from the sun, but it is also one of the things most often flagged as a violation. When are car shades in front of a home a violation?
A canopy over a shop entrance or outdoor seating attracts customers, but it is an addition to the facade and subject to requirements. These are the essential requirements for shop and restaurant canopies.
Designing a villa is a decision you live with for decades. A mistake in the space layout or in studying the plot can cost you more than the design itself. This complete guide walks through the villa design journey in Saudi Arabia from concept to permit, with links to detailed articles for each stage.
A 300 m² plot is one of the most common residential plot sizes in modern subdivisions. The challenge is that the buildable area after setbacks is much less than 300 m², so every metre needs planning. Here are ideas for designing a 300 m² villa with a practical layout.
A two-floor villa with a rooftop annex is the most common model in Saudi cities, because it balances space, cost and privacy. Here are practical ideas for designing a two-floor villa with an annex.
A residential-commercial building is an investment project before it is a building. The apartment layout, shop sizes, residents' entrances and parking are all design decisions that determine rent, occupancy and ease of sale. Here are the principles of designing a residential-commercial building for a higher return.
Two neighbouring plots of the same size can have very different buildable areas. The reason: setbacks, building ratios and the number of floors. These requirements are the first thing to know before buying or designing.
Once the office has prepared the architectural drawings, they go through review stages before they are approved. Understanding what the Municipality reviews in architectural drawings helps you avoid repeated comments.
Most villa design mistakes do not show up on the drawings but after you move in: a majlis that is never used, a hot kitchen, long corridors. These are the most common mistakes and how to avoid them.
When fitting out your home or office, you face an early question: do you contract for design only and then look for a contractor, or contract one company for both design and build? Each option has its advantages and risks.